To facilitate the approval of a building permit application, we strongly recommend that you review the requirements for your construction project as so enumerated on the flyers available below.
Please choose the applicable flyer for your specific project(s). Please note that the following list of requirements may not reflect all documents and items required for permit review and approval. During the review process, there may be additional items and documents requested by staff. Also, the permit may require permits from other local, state or federal agencies and you will be notified of these requirements during the permit review process.
Permit Tips Above Ground Pool (revised 6-09) Advertising Sign Business Occupancy Deck (revised 7-08) Demolition Electrical Alarm Electrical Sign Fence Heat Ordinance In Ground Pool (revised 7-09) Re-roofing (revised 9-09) Detached Garage/Shed Plan Application & Requirements (revised 7-08) Spa Tent (revised 7-08)
Architectural Advisory (new construction) Engineering Advisory Site Engineering Review - Floodplain Compliance Site Engineering Review – Single Family Residence Site Engineering Review - Commercial/Industrial Construction
Specific requirements for the following unincorporated townships. Lyons Township Requirements Maine Township Requirements Northfield Township Requirements Schaumburg Township Requirements Wheeling Township Requirements
Administration, Bureau of
Cook County Administration Building 69 W. Washington, Suite 2830 Chicago, Illinois 60602
URL: cookcountygov.com/ BuildingZoning
North Side Field Office: 2nd Municipal District Court Building, 5600 Old Orchard Road, Room #022 Skokie, IL 60077 Telephone: (847)470-5000 Hours: M-F: 8.30AM-3.30PM; Sun-Sat: Closed
South Side Field Office: 5th Municipal District Court Building 7600 W. 103Rd Street, Room #064 Bridgeview, IL 60455 Telephone: (708)974-6266 Hours: M-F: 8.30AM-3.30PM; Sun-Sat: Closed